Unpack And Install The Power Supply; Connect Lan 1; 3Pe Card Connections - Avaya 1000M Upgrade

Cs 1000m sg cp piv
Table of Contents

Advertisement

Page 124 of 212
Figure 30

3PE card connections

Net
PS 0
1
2
3
4
5

Unpack and install the power supply

Connect LAN 1

NN43021-461
Standard 06.03
Performing the upgrade
Core
cCNI
A
B
Enb
Dis
6
7
8
9
10 11
c9 c10 c11 c12 c13 c14 c15 CP
Procedure 35
Installing the NT6D41CA (DC) or NT8D29BA (AC) power supply
1
Unpack the power supply.
2
Faceplate-disable the power supply.
3
Insert power supply into Core/Net module power supply slot.
The LAN 1 port is used to enable redundancy features between the two Core/
Net modules. LAN 1 can also be connected to a local area network (LAN) for
use with LAN based administration tools.
The options for the LAN 1 connections are shown in Figure 31 on
June 2014
NT8D80AZ cable
Net
SYS
CPPIV
UTIL
Enb
Dis
LAN 1
LAN 2
L
USB
L
COM 1 COM 2
C
U
INIT
RESET
CF
PWR HDD
PS 0
1
2
NT8D80AZ cable
End of Procedure
Core
cCNI
A
B
Enb
Dis
3
4
5
6
7
8
9
10 11
c9 c10 c11 c12 c13 c14 c15 CP
SYS
CPPIV
UTIL
Enb
Dis
LAN 1
LAN 2
L
USB
L
COM 1 COM 2
C
U
INIT
RESET
CF
PWR HDD
page
126.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1 61c

Table of Contents