Cable Core 0; Inspect The Nt4N29 Cables; Installing Intermodule Cables - Avaya 1000M Upgrade

Cs 1000m sg cp piv
Table of Contents

Advertisement

Page 122 of 212

Cable Core 0

NN43021-461
Standard 06.03
Performing the upgrade

Inspect the NT4N29 cables

The NT4N29 cables must be installed for existing Network group 0. If the
system has XSDI cards, reinstall the cards and attach the cables. See
Figure 29 on
page
123.
Install intermodule cables
Procedure 34

Installing intermodule cables

1
Locate and unpack the NT8D99AD and NT8D80BZ cables.
2
Install NT8D99AD cables between the D connectors on the backplane of
each Core/Net module. Install another NT8D99AD cable between the
E connectors on the backplane of each Core/Net module (see Figure 29
.
on
page
123)
3
Install an NT8D80BZ cable between the J3 connector on the 3PE card in
Core/Net 0 and the J3 connector on the 3PE card in Core/Net 1. Install
another cable between the J4 connectors on the 3PE cards (see
Figure 30 on
page
June 2014
124).
End of Procedure