Preconversion Steps - Avaya 1000M Upgrade

Cs 1000m sg cp piv
Table of Contents

Advertisement

Page 204 of 212
Hardware Upgrade
Table 27
Hardware audit
Hardware Audit
Perform the Hardware Audit prior to the scheduled upgrade.
Verify Shipping List - Complete and Accurate
Audit Site for new hardware locations
Pre Run Cables if possible
Review All switch settings for new cards
Read all applicable

Preconversion steps

Table 28
Preconversion steps (Part 1 of 2)
Pre Conversion Steps
A capture file should be made of the following information using a PC or Printer.
Perform an overall system check:
LD 135 SCPU (ensure that the system is redundant)
LD 137 STAT/TEST CMDU
LD 96 STAT DCH
LD 48 STAT AML
LD 32 STAT
LD 60 STAT
NN43021-461
Standard 06.03
Appendix A: Upgrade checklists
Hardware audit
document
Procedures completely
June 2014
Yes
No