Verifying the upgraded database

Making the system redundant

NN43021-461
Standard 06.03
Performing the upgrade
At this point the system reloads and initializes.
Procedure 41
Verifying the upgraded database
1
Print ISSP (system software issue and patches)
LD 22
REQ
****
Core 1 is now active, clock 1 is active CNI is disabled in
Core 0. The system is in split mode.
At this point, Core/Net 0 is ready to be synchronized with Core/Net 1.
Procedure 42
Making the system redundant
1
Hardware enable the CNIs on Core/Net 0.
2
From Core/Net 1, enter LD 135 and issue the JOIN command. The high
speed pipe (HSP) status is now up. This begins the synchronization of the
Cores.
LD 135
JOIN
June 2014
End of Procedure
Load program
ISSP
Exit program
End of Procedure
Load program
Join the 2 CPUs together to become redundant