Installing The Shelf 1 Fiber Optic Ring (Descending) - Avaya 1000M Installation And Commissioning Manual

Communication server
Hide thumbs Also See for 1000M:
Table of Contents

Advertisement

Installing the Shelf 1 fiber optic ring (descending)

Cabling Common Equipment in a Multi Group system
Figure 99
Shelf 0 fiber optic ring on a 4 group machine
Group 1, shelf 1
Tx (J1)
Rx (J2)
J3
J4
Group 1, shelf 0
Tx (J1)
Rx (J2)
J3
J4
Group 0, shelf 1
Tx (J1)
Rx (J2)
J3
J4
NTRC48xx fiber optic cable
To create the Shelf 1 fiber optic loop, connect the FIJI cards in each Network
Shelf 1 in descending order (Figure 100 on
Procedure 35
Installing the Shelf 1 fiber optic ring
1
Start with the Tx (J1) port in Group 0, Shelf 1.
2
Connect a NTRC48xx FIJI Fiber Ring Cable of the appropriate length
from the Tx (J1) port of the FIJI card in Group 0, Shelf 1 to the Rx (J2) port
of the FIJI card in the highest Network group, Shelf 1. This is the longest
NTRC48xx cable that came with the shipment.
3
Connect a NTRC48xx cable from the Tx (J1) port of the FIJI card from the
Tx (J1) port in the highest Network group, Shelf 1 to the Rx (J2) port in the
second highest Network group, Shelf 1.
Shelf 0 fiber optic ring
Group 2, shelf 1
Tx (J1)
Rx (J2)
J3
J4
Group 2, shelf 0
Tx (J1)
Rx (J2)
J3
J4
Group 0, shelf 0
Tx (J1)
Rx (J2)
J3
J4
End of Procedure
page
Large System Installation and Commissioning
Page 237 of 436
Group 3, shelf 1
Tx (J1)
Rx (J2)
J3
J4
Group 3, shelf 0
Tx (J1)
Rx (J2)
J3
J4
553-9122
238).

Advertisement

Table of Contents
loading

Table of Contents