Testing The Cores - Avaya 1000M Upgrade

Cs 1000m sg cp piv
Table of Contents

Advertisement

Testing the Cores

Procedure 43
Testing Core/Net 1
At this point in the upgrade, Core/Net 0 is tested from active Core/Net 1. Upon
successful completion of these tests, call processing is switched and the same
tests are performed on Core/Net 1 from active Core/Net 0. As a final step, call
processing is then switched again to Core/Net 1.
From Core/Net 1, perform these tests:
1
Perform a redundancy sanity test:
LD 135
STAT CPU
TEST CPU
2
Check the LCD states:
a.
Perform a visual check of the LCDs.
b.
Test LCDs:
LD 135
DSPL ALL
3
Test the System Utility cards and the cCNI cards:
LD 135
STAT SUTL
TEST SUTL
STAT CNI c s
TEST CNI c s
Performing the upgrade
Load program
Obtain status of CPU and memory
Test CPU
Load program
Load program
Obtain the status of the System Utility
card
Test the System Utility card
Obtain status of cCNI cards (core, slot)
Test cCNI (core, slot)
61C to CS 1000M SG CP PIV Upgrade
Page 151 of 212

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1 61c

Table of Contents