Connecting A Switch Box And Terminal To Com1 And Com2 Ports - Avaya 1000M Installation And Commissioning Manual

Communication server
Hide thumbs Also See for 1000M:
Table of Contents

Advertisement

Figure 70
One terminal for the COM1 ports
Terminal
NT8D95
Network Module
SDI port on
I/O panel
Connecting a switch box and terminal to
COM1 and COM2 ports
Connecting a system terminal or modem
cable
Core/Net 0
Use Procedure 19 to connect COM1 ports to a switch box and a terminal (see
Figure 71 on
page
180).
Procedure 19

Connecting a switch box and terminal to COM1 and COM2 ports

1
Set the terminal to 9600 baud, 7 data, space parity, one stop bit, full
duplex, XON.
2
Connect an NT8D95 cable to the terminal and to the switch box.
3
Connect NT8D95 cables to a matching connector on the switch box.
When using an A0377992 ABCDE box, connect:
— CPU 0 to connector A.
— CPU 1 to connector B.
4
Connect the NT8D95 cables from the switch box to J25 on the I/O panel
in the rear of the cPCI Core/Network Modules.
Rear View
Large System Installation and Commissioning
Page 179 of 436
J25 on
I/O panel
Terminal
Core/Net 1
NT8D95
cable
553-A0133

Advertisement

Table of Contents
loading

Table of Contents