Figure 41: Installing The New Fp Board - Kontron CG2300 Installation And Maintenance Manual

Carrier grade server
Hide thumbs Also See for CG2300:
Table of Contents

Advertisement

3. Reconnect all of the cables on the FP board. For locations of each header on the board, see Figure 39.
4. Re-install the fan cage, the baseboard power cables, the support cross bar, and the chassis cover. For instructions, see
(RC), (RG), (RH), and (RL).
5. If this is the last task you are performing inside the chassis, plug in the power cord(s) and re-attach any peripheral
devices.
61

Figure 41: Installing the New FP Board

Installation and Maintenance Guide
www.kontron.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents