Installing An Eusb Module; Figure 37: Installing An M.2 Flash Drive On The Server Board - Kontron CG2300 Installation And Maintenance Manual

Carrier grade server
Hide thumbs Also See for CG2300:
Table of Contents

Advertisement

4.
Re-install the left-side riser card assembly and the chassis cover. For instructions, see (RK) and (RL) in Chapter 6.
5.
If this is the last task you are performing, plug in the power cord(s) and re-attach any peripheral devices.
5.2.13

Installing an eUSB Module

A separately purchased, optional Embedded USB flash drive (eUSB) provides local USB flash memory storage for various uses,
such as system information, diagnostic partitions, and configuration data. The eUSB is installed on the S2600CW2SK server
board in front of PCIe slot 3.
Before you can install an eUSB module, you must first remove the chassis cover, the left riser card assembly, and the hardware
RAID backup battery assembly. For instructions, see (A), (B1), and (F) in Chapter 4.
To install the eUSB module:
1.
Locate the standoff and connector on the baseboard. (Figure 38)
57

Figure 37: Installing an M.2 Flash Drive on the Server Board

Installation and Maintenance Guide
www.kontron.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents