Figure 47: Installing The New Pdb In The Chassis - Kontron CG2300 Installation And Maintenance Manual

Carrier grade server
Hide thumbs Also See for CG2300:
Table of Contents

Advertisement

3.
Connect all of the new cables on the new PDB to their connectors on the SAS backplane, server board, and fan control
board, being careful to route them as low as possible so as not to interfere with other components or air flow. For
instructions, see (RE), (RG), and (RD) in Chapter 6.
4.
Place the new auxiliary I/O cable/dongle in the PCI air baffle and re-attach the baffle to the side wall of the chassis. (Figure
47, "C" and "D")
5.
Re-install the SAS HDD backplane board and surrounding air baffle, the support cross bar, and the chassis cover. For
instructions, see (RB), (RH) and (RL) in Chapter 6.
6.
Push the power supply module(s) back into place so they are mated with the PDB.
7.
If this is the last task you are performing inside the server chassis, plug in the power cord(s), and re-attach any peripheral
devices.
69

Figure 47: Installing the New PDB in the Chassis

Installation and Maintenance Guide
www.kontron.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents