Gpib Operation; Status Structure - Keithley 2302 Instruction Manual

Battery/charger simulator
Hide thumbs Also See for 2302:
Table of Contents

Advertisement

7

GPIB Operation

Figure 7-1
IEEE-488 connector ...........................................................................................
Figure 7-2
Daisy chaining ....................................................................................................
8

Status Structure

Figure 8-1
Status model structure ........................................................................................
Figure 8-2
16-bit status register ...........................................................................................
Figure 8-3
Status byte and service request ..........................................................................
Figure 8-4
Standard event status ........................................................................................
Figure 8-5
Operation event status ......................................................................................
Figure 8-6
Measurement event status ................................................................................
Figure 8-7
Questionable event status .................................................................................
11
DISPlay, FORMat, and SYSTem
Figure 11-1
IEEE-754 single precision data format ............................................................
Figure 11-2
IEEE-754 double precision data format ...........................................................
13
Performance Verification
Figure 13-1
Connections for voltage verification tests ........................................................
Figure 13-2
Connections for output current and 5A range current verification tests ..........
Figure 13-3
Connections for 5mA current verification tests .............................................
Figure 13-4
Connections for 500mA current verification tests .........................................
Figure 13-5
Connections for DVM accuracy verification .................................................
14
Calibration
Figure 14-1
Connections for voltage calibration .................................................................
Figure 14-2
Connections for 5A/500mA current calibration ...............................................
Figure 14-3
Connections for 5mA range calibration ...........................................................
Figure 14-4
Jumper connections to reset calibration code .................................................
E
Applications Guide 1
Figure E-1
Battery schema.tic ..............................................................................................
Figure E-2
Actual battery pack terminal voltage during GSM phone simulation ................
Figure E-3
Simulated GSM phone current profile ...............................................................
Figure E-4
Electronic resistance of NiCd, NiMH, and Li ion battery packs .......................
Figure E-5
Effect of the variable output impedance control ................................................
Figure E-6
Li ion voltage drop during the transmit portion of the pulse ............................
Figure E-7
Model 2306 voltage drop during the transmit portion of the pulse ....................
F
Model 2302 Specifics 1
Figure F-1
Model 2302 and 2302-PJ single channel battery simulator ...............................
Test Equipment Depot - 800.517.8431 - 99 Washington Street Melrose, MA 02176
TestEquipmentDepot.com
7-2
7-3
8-3
8-5
8-6
8-11
8-13
8-15
8-16
11-5
11-6
13-6
13-9
13-12
13-14
13-16
14-6
14-7
14-9
14-18
E-2
E-3
E-4
E-4
E-5
E-6
E-7
F-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2302-pj23062306-vs2306-pj

Table of Contents