HP 316095-B21 - StorageWorks Edge Switch 2/24 Service Manual page 95

Edge switch 2/24 service manual
Hide thumbs Also See for 316095-B21 - StorageWorks Edge Switch 2/24:
Table of Contents

Advertisement

Was a corrective action performed?
YES
NO
Go to
27
Monitor port operation for approximately five minutes.
Did the link incident recur?
YES
NO
The Fibre Channel link and switch appear operational.
Exit MAP.
28
Clean fiber-optic connectors on the jumper cable.
a. Notify the customer the port will be blocked. Ensure the customer's system
administrator quiesces Fibre Channel frame traffic through the port and sets the
attached device offline.
b. Block the port
c. Disconnect both ends of the fiber-optic jumper cable.
d. Clean the fiber-optic connectors
e. Reconnect the fiber-optic jumper cable.
f. Unblock the port
g. Monitor port operation for approximately five minutes.
Did the link incident recur?
YES
NO
The Fibre Channel link and switch appear operational.
Exit MAP.
29
Disconnect the fiber-optic jumper cable from the switch port and connect the cable to
a spare port.
Is a link incident reported at the new port?
YES
NO
Go to
edge switch 2/24 service manual
step
28.
(Block and Unblock Ports on page
(Block and Unblock Ports on page
step
31.
3–25).
(Clean Fiber-Optic Components on page
3–25).
Diagnostics
3–27).
2–75

Advertisement

Table of Contents
loading

Table of Contents