HP 316095-B21 - StorageWorks Edge Switch 2/24 Service Manual page 98

Edge switch 2/24 service manual
Hide thumbs Also See for 316095-B21 - StorageWorks Edge Switch 2/24:
Table of Contents

Advertisement

Diagnostics
36
Install an SFP optical transceiver in the port receptacle
Transceiver on page
a. This procedure is concurrent and can be performed while switch power is on.
b. Verify the location of the failed port.
c. Perform an external loopback test for the port as part of FRU removal and
replacement.
Exit MAP.
2–78
4–2).
(RRP 1: SFP Optical
edge switch 2/24 service manual

Advertisement

Table of Contents
loading

Table of Contents