Inspect the front of the switch.
Is the amber LED illuminated but not blinking (beaconing)?
YES
NO
Go to
Contact the next level of support. Exit MAP.
7
Is fault isolation being performed at the HAFM server (or customer-supplied server)?
YES
NO
Fault isolation is being performed at the EWS interface. Go to
8
Does a blinking red and yellow diamond (failed FRU indicator) appear to overlay a fan
module/power supply graphic at the Hardware View?
NO
YES
A fan module failure is indicated. Go to
9
At the Hardware View, does a grey square appear at the alert panel, a No Link status
appear at the Edge-24 Status table, and graphical FRUs appear uninstalled?
YES
NO
A green circle appears at the alert panel and the switch appears operational.
Exit MAP.
The grey square indicates the HAFM server (or customer-supplied server) cannot
communicate with the switch because:
The switch-to-server Ethernet link failed.
AC power distribution in the switch failed, or AC power was disconnected.
The switch CTP failed.
Continue.