3Com 7757 Configuration Manual page 936

3com switch 7750 family
Hide thumbs Also See for 7757:
Table of Contents

Advertisement

936
C
85: M
HAPTER
ONITOR
L
C
INK
ONFIGURATION
# Configure Ethernet2/0/1 as the master port of the Smart Link group and
Ethernet2/0/2 as the slave port.
[SwitchA-smlk-group1] port Ethernet 2/0/1 master
[SwitchA-smlk-group1] port Ethernet 2/0/2 slave
# Configure to send flush messages in VLAN 1.
[SwitchA-smlk-group1] flush enable control-vlan 1
2 Enable Monitor Link on Switch C and Switch D and enable the function of
processing flush messages received from VLAN 1. Perform the following
configuration on Switch C. The operation procedure on Switch D is the same as
that performed on Switch C.
# Enter system view.
<SwitchC> system-view
# Create Monitor Link group 1 and enter Monitor Link group view
[SwitchC] monitor-link group 1
# Configure Ethernet2/0/1 as the uplink port of the Monitor Link group and
Ethernet2/0/2 and Ethernet2/0/3 as the downlink ports.
[SwitchC-mtlk-group1] port Ethernet 2/0/1 uplink
[SwitchC-mtlk-group1] port Ethernet 2/0/2 downlink
[SwitchC-mtlk-group1] port Ethernet 2/0/3 downlink
# Return to system view. Enable the function of processing flush messages
received from VLAN 1 on Ethernet2/0/2 and Ethernet2/0/3.
[SwitchC-mtlk-group1] quit
[SwitchC] smart-link flush enable control-vlan 1 port Ethernet 2/0/2
to Ethernet 2/0/3
3 Enable the function of processing flush messages received from VLAN 1 on
Ethernet 2/0/10 and Ethernet 2/0/11 of Switch E.
# Enter system view.
<SwitchE> system-view
# Enable the function of processing flush messages received from VLAN 1 on
Ethernet 2/0/10 and Ethernet 2/0/11.
[SwitchE] smart-link flush enable control-vlan 1 port Ethernet 2/0/1
0 to Ethernet 2/0/11

Advertisement

Table of Contents
loading

This manual is also suitable for:

775077587754

Table of Contents