3Com 7757 Configuration Manual page 848

3com switch 7750 family
Hide thumbs Also See for 7757:
Table of Contents

Advertisement

848
C
77: B
ROM
HAPTER
OOT
n
H
S
L
AND
OST
OFTWARE
OADING
Step 2: Configure the IP address of VLAN1 on the switch to 192.168.0.65, and
subnet mask to 255.255.255.0.
You can configure the IP address for any VLAN on the switch for FTP transmission.
However, before configuring the IP address for a VLAN interface, you have to
make sure whether the IP addresses of this VLAN and PC are routable.
<SW7750> system-view
System View: return to User View with Ctrl+Z.
[SW7750] interface Vlan-interface 1
[SW7750-Vlan-interface1] ip address 192.168.0.65 255.255.255.0
Step 3: Enable FTP service on the switch, configure the FTP user name to test,
password to pass, and directory to FLASH root directory.
[SW7750-Vlan-interface1] quit
[SW7750] ftp server enable
[SW7750] local-user test
New local user added.
[SW7750-luser-test] password simple pass
[SW7750-luser-test] service-type ftp ftp-directory flash:/
Step 4: Enable FTP client software on PC. Refer to Figure 224 for the command
line interface in Windows operating system.
Figure 224 Command line interface
Step 5: Enter cd in the interface to switch to the path that the BootROM upgrade
file is to be stored, and assume the name of the path is "D:Bootrom", as shown in
Figure 225.

Advertisement

Table of Contents
loading

This manual is also suitable for:

775077587754

Table of Contents