Page 1
32 MB M ® FOR THE http://www.3com.com/ Part No. DIA37OU-1AAA02 Published November 1998 EMORY UILDER NSTALLATION UIDE PGRADE 7000HD S WITCH...
Page 2
3Com Corporation reserves the right to revise this documentation and to make changes in content from time 95052-8145 to time without obligation on the part of 3Com Corporation to provide notification of such revision or change. 3Com Corporation provides this documentation without warranty, term, or condition of any kind, either implied or expressed, including, but not limited to, the implied warranties, terms or conditions of merchantability, satisfactory quality, and fitness for a particular purpose.
Step 1: Removing the CoreBuilder 7000HD Switch Module from the Chassis Step 2: Removing the 16MB Memory SIMM Step 3: Inserting the 32MB Memory SIMM Step 4: Returning the CoreBuilder 7000HD Switch Module back to the Chassis Verifying 32MB Memory Upgrade NDEX...
Scope of This The 32MB Memory Upgrade for the CoreBuilder 7000HD Switch Guide Installation Guide provides all the information needed to mount the 32MB Memory SIMM on the CoreBuilder 7000HD Switch Module. This document provides a step-by-step installation procedure for the 32MB Memory SIMM.
CoreBuilder 7000HD which they serve includes: CoreBuilder 7000HD Installation and Startup Guide (# DUA3700-0BAA03) CoreBuilder 7000HD User Guide (# DUA3700-0AAA05) Table 2 describes important information in the CoreBuilder 7000HD documentation to help you locate the information you need. If you want to...
Page 7
Find out what type of configuration tasks you can perform on the CoreBuilder 7000 ATM switch. Perform configuration or administration tasks using the Administration Console. Get assistance. CoreBuilder 7000/7000HD Documentation Road Map (continued) Read... User Guide User Guide User Guide Installation and Startup...
SIMM and to the switch from electrostatic emmisions. Installation In order to help you, 3Com supplies all the tools necessary for the Upgrade KIt upgrade in the installation upgrade kit. The installation upgrade kit supplied with the 32MB SIMM contains the following items (see...
1: I HAPTER NTRODUCTION
Safety Before working with any component in the CoreBuilder 7000 Precautions System, read and adhere to the following safety precautions. ESD Safety Information Electrostatic Discharge (ESD) can damage components on the system module. ESD, which occurs when the module or a component is improperly handled, can cause complete or intermittent failures.
Information sur la prévention de décharges électrostatiques Les décharges électrostatiques peuvent endommager des éléments du module. Ces décharges, qui surviennent lors d’une manipulation inadéquate du module, peuvent entraîner une défaillance temporaire ou permanente. ATTENTION: Pour éviter des dommages électrostatiques: Assurez-vous d’être bien branché à la terre. Utilisez un sous-pied et un tapis relié...
SIMM from the antistatic bag and inspect it for damages. If the SIMM appears to be damaged, return it to the antistatic bag and contact your 3Com Representitive. Identifying the To accurately identify the product as 32MB check for a label with 32MB Memory the inscription “32MB”...
32MB Memory Upgrade Steps Step 1 Removing the CoreBuilder 7000HD Switch Module from the Chassis Before starting, make sure that you wearing the ESD wrist strap and that you are properly connected to grounding equipment as described in “Safety Precautions” on page 1-2.
Page 14
2: 32M 7000HD S HAPTER EMORY PGRADE NSTALLATION ON THE UILDER WITCH ODULE
Loosening the Captive Screws Grasp the ejector handles of the card and push them outward (Figure 2-2). This ejects the card slightly. You may have to apply considerable force to the handles in order to eject the card.
Page 15
If you experience difficulty in removing the switch, insert the special key in the space above the switch module on the right side near the black handle of the power supply (Figure 2-3). 32MB Memory Upgrade Steps...
Page 16
2: 32M HAPTER EMORY
Raise the key and slide the switch module out (Figure 2-4).
Using both hands, pull the switch module out. PGRADE NSTALLATION ON THE Inserting the Special Key Sliding the Switch Module Out...
SIMM there are two metal spring clips (one on each side of the SIMM) that hold the SIMM in place (Figure 2-6). 16MB Memory SIMM Front Panel
Front View 32MB Memory Upgrade Steps Position of 16MB SIMM in CoreBuilder 7000HD Switch Module -...
Page 18
With your thumb and index finger, remove the SIMM from the connector at a 45 degree angle (Figure 2-8). PGRADE NSTALLATION ON THE Side View of the Memory SIMM Removing the 16MB SIMM 7000HD S UILDER WITCH ODULE...
Inserting the 32MB Memory SIMM Remove the 32MB Memory SIMM from the packaging material. Make sure that the front panel of the switch module is facing you, and that the switch is on proper grounding material, or an antistatic bag.
Page 20
2: 32M 7000HD S HAPTER EMORY PGRADE NSTALLATION ON THE UILDER WITCH ODULE Cutout
Inserting the 32MB Memory SIMM With one or two fingers (not on the chips) gently press down. A click is heard when the SIMM is in place (Figure 2-10).
Reconnect the power cable. Login to the LMA with the username: . From the LMA of the CoreBuilder 7000HD Switch Module, select option
and then select option
...
Page 22
2-10 2: 32M 7000HD S HAPTER EMORY PGRADE NSTALLATION ON THE UILDER WITCH ODULE...
ATM switch conventions used in this guide CoreBuilder 7000 Installation and Startup Guide CoreBuilder 7000 Switch Module removing i, ii CoreBuilder 7000HD User Guide CoreBuilder 7000HD User Guide documentation related ejector handles guide conventions organization scope how to read documentation...
Page 24
NDEX verifying memory upgrade who should use this guide...
Need help?
Do you have a question about the COREBUILDER 7000HD and is the answer not in the manual?
Questions and answers