Operating Procedure For The Controller Section - Omron NSJ CONTROLLERS - 03-2008 Operation Manual

Nsj controllers
Table of Contents

Advertisement

Operating Procedure for the Controller Section

2-3

Operating Procedure for the Controller Section

Note
1. Start the CX-Programmer.
Select Programs - OMRON - CX-One - CX-Programmer -
CX-Programmer (assuming that the CX-Programmer was installed in the
CX-Programmer group) or right-click the NSJ Controller in the Network
Configuration Window of the CX-Integrator and select Start Special
Application - Start Only from the pop-up menu.
2. Create a New Project.
Select File - New.
Input the following in the Change PLC Dialog Box.
• Device Name
• Select NSJ in the Device Type Field.
• Select USB in the Network Type Field.
3. Connect Online and Create I/O Tables.
Right-click the NSJ Controller in the I/O tables and select Start Special
Application - Start Only to start the CX-Designer. (See note.)
Set the following as required.
• Routing tables
• Built-in DeviceNet Section (Right-click DeviceNet in the I/O tables.)
• NSJ Controller Link (Right-click Controller Link in the I/O tables.)
4. Set and Transfer the PLC Setup (as required).
5. Create, Transfer, and Monitor the Program.
6. Change the Operating Mode to MONITOR or RUN.
The CX-Designer can be started from the I/O tables in the CX-Programmer if
the CX-Programmer is installed as part of the CX-One.
Section 2-3
CX-Programmer Oper-
ation Manual (Cat. No.
W446)
CX-Programmer Oper-
ation Manual (Cat. No.
W446)
CX-Programmer Oper-
ation Manual (Cat. No.
W446)
Section 3 Routing
Tables, Section 4 Data
Links for Controller
Link and SYSMAC
LINK, and Section 6
DeviceNet in CX-Inte-
grator Operation Man-
ual (Cat. No. W464)
2-4 Operating Procedure for Display Section
CX-Programmer Oper-
ation Manual (Cat. No.
W446)
CX-Programmer Oper-
ation Manual (Cat. No.
W446)
35

Advertisement

Table of Contents
loading

Table of Contents