2. If installed, open the cable management arm.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Remove the server from the rack .
6. Place the server on a flat, level work surface.
7. Remove the access panel .
8. Disconnect the cables from the 2 SFF stacked drive backplane.
9. If installed, remove all drives from the 2 SFF stacked drive cage.
10. Remove the rear 2 SFF stacked drive cage:
a. Remove the stacked drive cage screws (callout 1).
b. Remove the rear 2 SFF stacked drive cage from top of the power supply cage (callout 2).