HPE ProLiant DL345 Gen11 Service And Maintenance Manual page 132

Table of Contents

Advertisement

a. Rotate the locking pin to the open (vertical) position (callout 1).
b. Slide the controller out of the bay (callout 2).
Results
Results
To replace the component, reverse the removal procedure.
Removing and replacing an OCP slot blank
Removing and replacing an OCP slot blank
Prerequisites
Prerequisites
Before you perform this procedure, make sure that you have a T-10 Torx screwdriver available.
About this task
About this task
CAUTION:
CAUTION:
The port blank provides EMI shielding and helps maintain proper thermal status inside the server. Do not operate the server
when a port blank is removed without the corresponding I/O port option installed.
Procedure
Procedure
1. Power down the server.
2. If installed, open the cable management arm.
HPE ProLiant DL345 Gen11 Server Service and Maintenance Guide
132

Advertisement

Table of Contents
loading

Table of Contents