Commissioning Sequence; Configuration Of System Settings Of The Display - Busch-Jaeger SD/U12.55.11-825 Manual

Hide thumbs Also See for SD/U12.55.11-825:
Table of Contents

Advertisement

7.5

Commissioning sequence

To be able to work with the DCA commissioning tool as effectively as possible, the following
work sequence (standard workflow) is recommended:
1. Start the ETS software (see chapter 7.2.1 "Starting the DCA" on page 39).
2. Create a new project or open an existing one.
3. Open the configuration surface via the "DCA" tab.
4. Configure basic settings for the display.
5. Create the navigation structure (see chapter 7.7 "Creating the navigation structure" on page
56).
6. Configure the operating pages (insert and configure control elements).
7. Configure the applications and application pages.
8. Edit the available communication objects.
9. Create group addresses and allocate the correct data point type (DPT) to all group
addresses used in the device (e.g. function: 1.001 switch).
Notice
Alternatively the allocation of the group addresses to the communication objects
can also be made in the "Communications objects" tab of the ETS.
7.6

Configuration of system settings of the display

The basic settings for the display can be specified beforehand.
1. Open the "Applications" tab in the library area.
2. Open "System settings".
The basic settings are displayed in the "Parameter" area and can be edited (see chapter
7.6.1 "Basic settings (system settings) of the panel" on page 44).
Available communication objects for certain functions are displayed in the
"Communication objects" area and can be used.
Group addresses can be allocated via the "Group addresses" area.
Product manual 2CKA001473B5472
Commissioning of the KNX function via DCA
│43

Advertisement

Table of Contents
loading

Table of Contents