Preparing the server
Preparing the
server for operation
Procedure
Procedure
1. Secure the air baffle hooks to the heatsink screws.
2. Install the access panel .
3. Install the server into the rack .
4. Connect all peripheral cables to the server.
5. Connect each power cord to the server.
6. Connect each power cord to the power source.
7. If installed, close the cable management arm.
8. Power up the server .
9. If removed, install the front bezel .
for operation
Preparing the server for operation
196