Installing an energy pack

Installing an energy pack
Prerequisites
Prerequisites
Make sure that a compatible type-p storage controller is installed .
Make sure that you have the storage controller backup power cable that ships with the storage controller.
Procedure
Procedure
1. If installed, remove the front bezel .
2. Power down the server.
3. If installed, release the cable management arm.
4. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5. Disconnect all peripheral cables from the server.
6. Remove the server from the rack .
7. Place the server on a flat, level work surface.
8. Remove the access panel .
9. Install the energy pack:
a. Insert the energy pack at an angle (callout 1).
b. Push and hold the latch (callout 2), and then press the cable end of the energy pack down (callout 3).
c. Connect the energy pack cable, and then secure the extra length of the cable in the clip (callout 4).
Installing an energy pack
155