Installing The Secondary Riser Option For Full-Height Expansion Cards - HPE ProLiant DL325 Gen10 Plus v2 User Manual

Hide thumbs Also See for ProLiant DL325 Gen10 Plus v2:
Table of Contents

Advertisement

Installing the secondary riser option for full-height expansion cards

Installing the secondary riser option for full-height expansion cards
When a full-height expansion card is installed in the secondary riser slot 3, the primary riser slot 2 will no longer support card
installation.
Prerequisites
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
T-15 Torx screwdriver
T-10 Torx screwdriver
Procedure
Procedure
1. If installed, remove the front bezel .
2. Power down the server.
3. If installed, release the cable management arm.
4. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5. Disconnect all peripheral cables from the server.
6. Remove the server from the rack .
7. Place the server on a flat, level work surface.
8. Remove the access panel .
9. Remove the primary riser cage.
10. Remove the retainer bracket for the primary riser slot 2.
Installing the secondary riser option for full-height expansion cards
139

Advertisement

Table of Contents
loading

Table of Contents