HPE ProLiant DL325 Gen10 Plus v2 User Manual page 95

Hide thumbs Also See for ProLiant DL325 Gen10 Plus v2:
Table of Contents

Advertisement

7. Insert the -48 V wire into the left side of the terminal block connector, and then tighten the screw to 1.3 N m (10 lb‑in) of torque.
8. Insert the return wire into the right side of the connector, and then tighten the screw to 1.3 N m (10 lb-in) of torque.
Installing a DC power supply
95

Advertisement

Table of Contents
loading

Table of Contents