Prepare The Server For Operation - HPE ProLiant EC200a Maintenance And Service Manual

Managed hybrid server
Table of Contents

Advertisement

Retain the blank for future use.
Remove the server drive assemblies (on page 25).
3.
Remove the middle frame from the server:
4.
Remove the screws and standoffs securing the middle frame.
a.
Lift the middle frame from the system board.
b.

Prepare the server for operation

Depending on what hardware was replaced, do one or more of the following:
1.
If removed, install the middle frame (on page 29).
a.
Removal and replacement procedures 28