HPE ProLiant DL325 Gen10 Plus v2 User Manual page 180

Hide thumbs Also See for ProLiant DL325 Gen10 Plus v2:
Table of Contents

Advertisement

10. Connect the switch cable (callout 1), and then secure the extra length of the cable in the cable tie (callout 2).
11. Install the access panel .
12. Install the server into the rack .
13. Connect all peripheral cables to the server.
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16. If installed, close the cable management arm.
Installing the chassis intrusion detection switch
180

Advertisement

Table of Contents
loading

Table of Contents