12. Secure the air baffle hooks to the heatsink screws.
13. Install the access panel.
14. Install the server into the rack.
15. Connect all peripheral cables to the server.
16. Connect each power cord to the server.
17. Connect each power cord to the power source.
18. If installed, close the cable management arm.
Installing the high-performance fans
127