14. Install the access panel .
15. Install the server into the rack .
16. Connect all peripheral cables to the server.
17. Connect each power cord to the server.
18. Connect each power cord to the power source.
19. If installed, close the cable management arm.
20. Power up the server .
21. If removed, install the front bezel .
Deploying an operating system
Deploying an operating system
22. Deploy a supported operating system to the boot device drive.
For more information, see the server QuickSpecs on the Hewlett Packard Enterprise website:
https://www.hpe.com/servers/dl325-gen10-plus-v2
https://www.hpe.com/servers/dl325-gen10-plus-v2
Installing the HPE NS204i-p NVMe OS Boot Device option