Download Print this page

Hyundai 10BOP-7 Operation Manual page 96

Advertisement

(5)
Attachment of pivoted connection
geared steering
Place the gear ring (item 2) and turn it so
that the bolt holes match the threaded
holes of the connecting construction.
Install the gear ring with a dead-blow soft
face hammer until contact is obtained.
Put on the pivoted bogie bearing (item 3)
with the peripheral recess upwards and
turn it that the bolt holes in the pivoted
bogie bearing match with the gear ring
and housing hole pattern.
Wet screws M8x40-10.9 with LOCTITE
243.
By means of the screws fasten the
pivoted bogie bearing and the gear ring
onto the connecting constructions.
Tighten the screws evenly in the
tightening sequence shown in figure 169.
Sequence of tightening:
Number 1 beginning
Tightening torque of cap screws : 34 Nm
Pay attention for installing of the drive
pinion that the gearing of drive pinion
and helical gear are not damaged.
Damages might cause louder running
noises and consequential damages!
12)
GENERAL INSTRUCTIONS AFTER
REASSEMBLY
(1)
For reinstallation of the power train into the
vehicle observe the installation instructions
at page 2-7.
(2)
Fill in oil according to the operating
instructions.
(3)
Transmission and vehicle respectively may
be used or operated at the earliest 24
hours after the reassembly again.
Number 12 end
3-50
7
1
6
3
12
9
2
Thus the reassembly is ended.
BRJ7DU166
BRJ7DU167
10
11
4
5
8
BRJ7DU169

Advertisement

loading

This manual is also suitable for:

13bop-7