Download Print this page

Hyundai 10BOP-7 Operation Manual page 238

Advertisement

(4)
Convert the automatic / manual switch to
manual.
The automatic/manual switch is located in
the lower left part of the PCB
Be sure to check if battery connector is
separated in advance.
(5)
MG/SW operation (Refer to error sheet)
(6)
Check the charging voltage soft start
function (refer to the monitor)
After 5 seconds next to turn the manual
switch on.
Input, floating charge and red charging
condition lamp is on.
After 15 seconds next to turn the manual
switch on.
Yellow charging condition lamp is on
while charging.
After green lamp becomes on, measure
the output voltage of the battery
connector by multi measure. If measured
voltage is between 62.5V ~ 63.5V, it is
normal. (Rated voltage : 63V)
After 30 seconds next to turn on the
manual switch, if buzzer rings for 10
seconds and END lamp is on, it is a
normal condition.
When yellow lamp under charging
condition is on after 1~2 times
repetition, convey the automatic/
manual switch to the automatic and
check if the charger trips automatically.
7-106
BOP7BAT08
BOP7BAT09
BOP7BAT10

Advertisement

loading

This manual is also suitable for:

13bop-7