Download Print this page

Hyundai 10BOP-7 Operation Manual page 240

Advertisement

5)
CHECK POINTS BEFORE APPLYING
A/S
(1)
AC input power source switch is input.
(2)
Check if the battery connector of the order
picker truck and charger's connector are
connected.
(3)
Check points when "Error" lamp is on in
the front monitor of the charger.
(4)
Check the front cover indicator.
A.F : Input three phase power source
continuity check = Check if input three
phase power source is normal with AC
voltage meter.
A.O : Error on selection of input power
source of 220V or 380V - Check it
appropriately with full three phases.
A.C : Check if the input power source
(220V or 380V) is normal.
O.C : Check the electric current, as
charging current of the battery is over-
standards condition.
O.V : Check the voltage, as charging
voltage of the battery is over-voltage
condition (66V).
Normally it is 63V
(5)
Check other abnormalities as well.
Then apply for A/S when on-site
measurements are not applicable.
1V.
7-108
BOP7BAT12

Advertisement

loading

This manual is also suitable for:

13bop-7