Geomx Dsp Instrument Maintenance; System Startup & Shutdown - nanoString GeoMx DSP User Manual

Instrument
Table of Contents

Advertisement

MAN-10152-01 for software v2.5
GeoMx DSP Instrument Maintenance
GeoMx DSP Instrument Maintenance
System Startup & Shutdown
The GeoMx DSP instrument should be shut
down and restarted at least weekly as well
as before every new run. Only a user with
administrative privileges can shutdown
through the Administration Menu. The
power button is located on the back of the
instrument
(see Figure
Start Up
1. Switch the GeoMx DSP instrument
power button to the On position. The
hardware will initialize, homing and resetting positions as necessary.
2. Once the system has initialized, the DSP screen and a login window will appear on the
monitor.
3. Once you have logged in, navigate to Data Collection , Records , Data Analysis, or
Administration. To begin a new run, click Assist (wrench icon) , then Restart Data Collection
Workflow to bring the software to the start of the workflow. Click Data Collection then
New/Continue Run .
FOR RESEARCH USE ONLY. Not for use in diagnostic procedures.
99).
GeoMx DSP Instrument User Manual
Figure 99: GeoMx DSP backside diagram
103

Advertisement

Table of Contents
loading

Table of Contents