Case CX490D Operator's Manual page 362

Crawler excavator
Hide thumbs Also See for CX490D:
Table of Contents

Advertisement

21. Reach the rear right-hand compartment.
22. Turn the ARM POSITION switch (5) to TOP position
to raise the arm until it stands vertical into its com-
partment on the upper frame. Check that the coun-
terweight is properly aligned to the upper frame.
23. Turn the CTWT POSITION switch (4) to LOWER
position to lower the counterweight to its mounting
frame. Make sure that the counterweight is properly
engaged to the mounting frame, and that it is aligned
to the upper frame, to the doors, and to the engine
hood. Make sure that the holes of the mounting bolts
on the upper frame and on the counterweight are
aligned.
9 - ACCESSORIES
9-56
17
SMIL20CEX1359BA
18
SMIL20CEX1360BA

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx500d

Table of Contents