Chapter 2: Beginning the Installation
1
1. Two equipment rack
brackets
56
3. Visually inspect the front panel of the switch for the pre-installed
components shown in Figure 19.
2
2. Seven line card slot
covers
4. One management panel
(Not field replaceable.)
Figure 19. Pre-installed Items on the Front and Side Panels
4. Visually inspect the rear panel for the pre-installed components shown
in Figure 20 on page 57.
3
4
3. One blank panel in power
supply slot B
1