Figure 26: Pre-Installed Items On The Front And Side Panels - Allied Telesis AT-SBx908 Installation Manual

Table of Contents

Advertisement

Chapter 3: Beginning the Installation
1
1. Two equipment rack
brackets
76
3. Visually inspect the front panel of the switch for the pre-installed
components shown in Figure 26.
2
2. Seven line card slot
covers
4. One management panel
(Not field replaceable.)
Figure 26. Pre-installed Items on the Front and Side Panels
4. Visually inspect the rear panel for the pre-installed components shown
in Figure 27 on page 77.
3
4
3. One blank panel in power
supply slot B
1

Advertisement

Table of Contents
loading

Table of Contents