Simple Operation Check - NF DP060LM Instruction Manual

Programmable ac power source
Table of Contents

Advertisement

2.7

Simple Operation Check

This section describes how to perform a simple operation check when you purchased a new product,
or after storing the product for a long period. This check should be performed without load. If you
are not satisfied with the results verified at the operation check, please request the repair to us or our
agent.
  Operation procedure
1. Connect the product to the mains referring to "2.4 Grounding and Power Connections".
2. Attach the resin-molded output terminal cover and the output cable holder without connecting
anything to the output terminals or any other terminal/connector.
3. Switch on the breaker of the distribution board, and then turn on the power switch of this product.
Check that all LEDs on the control panel illuminate for several seconds, and then turn off, and that
our logo mark appears on the LCD screen (see 3.2.3). If LAN interface is equipped, "LXI" is
displayed below the logo mark.
DP060LM/DP120LM/DP180LM

2.7 Simple Operation Check

23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dp120lmDp180lm

Table of Contents