Cb20; Cbr1 - Linak Inline LA20 User Manual

Linear actuators and electronics
Hide thumbs Also See for Inline LA20:
Table of Contents

Advertisement

11. CB20 (MEDLINE
CARELINE
®
Usage
• Compatible with specific versions of LA23, LA31, LA34, LA40, LA43, LA44 and BL1
• Duty cycle: 10 % ˜ max . 2 min . continuous use followed by 18 min . not in use
• Ambient temperature: + 5 ˚C to + 40 ˚C
• Approvals: IEC60601-1:2005 3
Please be aware:
CB20 is delivered in 3 separate units - CU20 + CP20 + BA20 . The units are not assembled at LINAK A/S .
Microprocessor
All control boxes with a microprocessor must be initialized before start-up . A description of the initialization procedure can be obtained from your LINAK
dealer . If an actuator is replaced, the microprocessor always has to be initialized before use (actuators with reed/hall) . If re-programmed, please ensure
that the correct software is used .
External battery charger
If anything other than a LINAK
Charging current: < 300 mA .
Recommendations
• Please note mains cable must be ordered separately
HOT PLUGGING
Removing or adding any OpenBus™ cables are not allowed when the CB is powered by mains supply! If necessary anyway follow the below procedure:
1 . Remove mains and wait 5 sec .
2 . Mount or dismount the required cables
If this procedure is NOT followed it may result in a damaged OpenBus™ driver circuit . The risk of a damaged circuit increases if the accessory has
a high start current (in rush current) .
• Please note mains cable must be ordered separately .
Battery running:
• If battery capacity is under 50% a "bip" sound is given for 2 seconds, when a hand control key is pressed .
• If the system is activated and the mains plug is pulled out, the system will stop . In the opposite case, if the system is running using battery power
and the mains plug is then plugged in, the system will continue running .
• The charging indicator can blink if the system operates with a high load causing the voltage to drop and because of this the batteries will start to
charge .
• The CB20 with battery back-up only commences battery charging when it is connected to the mains .
• A running battery must be charged for at least 12 hours before use .
• For recommendations on charging cycles and first use of the BA20 battery pack, please refer to chapter 5 .
12. CBR1 (MEDLINE
CARELINE
®
)
®
CB20 is a platform which offers a unique safety concept, logging off service data and it is possible to
connect a variety of accessories to the control box .
The CB20 consists of 3 modules :
CP20 = Control Power
For recommendations on maintenance and storage of the BA20 battery packs,
please refer to chapter 5 .
ed ., ANSI / AAMI ES60601-1:2005, 3
rd
charger is used, it must conform to the following specifications: Charging voltage: 28 .0 VDC ± 2 %
®
HOMELINE
)
®
®
The CBR1 has been developed for use together with the RA40 Rotary actuator . The CBR1 can be installed in the
same profile as the RA40 Rotary actuator thus saving mounting and wiring .
CU20 = Control Unit
edition, CAN/CSA-22 .2 No 60601-1:2008 approved
rd
Page 139 of 295
BA20 = Battery .

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Deskline la23Medline la23Medline la40Careline la23Careline la40Techline la23 ... Show all

Table of Contents