Installation: Joint #5 Motor - Epson C Series Maintenance Manual

6-axis robots
Hide thumbs Also See for C Series:
Table of Contents

Advertisement

Installation: Joint #5 Motor

When tightening hexagon socket head cap bolts, refer to the 2.4 Tightening Hexagon Socket
NOTE
Head Cap Bolts.
1. Install the motor plate to the Joint #5 motor.
Hexagon socket head cap bolts: 2-M4×12
Tightening torque: 4.9 N·m (50 kgf·cm)
Be careful of the direction of the motor plate. (See the photo.)
2. Mount the Joint #5 electromagnetic brake to the Joint #5 motor
unit.
Hexagon socket set screws: 3-M2.5×10
Be careful of the direction of the Joint #5 electromagnetic brake
wiring. (See the photo.)
3. Mount the drive boss and the pulley 1 to the Joint #5 motor unit.
Set the drive boss and the pulley 1 so that their surfaces become
flat.
Hexagon socket set screws: 2-M3×8 (with a brass bushing)
Fix the pulley 1 and the motor shaft.
Leave 0.5 mm for the electromagnetic brake.
Hexagon socket set screws: 2-M3×8 (with a brass bushing)
Set the set screws as indicated below.
Drive boss
C
B
E
C Series Maintenance Manual Rev.2
Pulley
A : Pulley and
A
motor shaft fixing screws
D
A
B : Pulley and
drive boss fixing screws
C : Bushing
C
D : Flat face for motor shaft
B
E : Flat face for drive boss
Motor shaft
C4 Maintenance 9. Joint #5
Motor cable
position
Electromagnetic
brake wiring
t = 0.5 mm
121

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4

Table of Contents