Installation: Joint #2 Reduction Gear Unit - Epson C Series Maintenance Manual

6-axis robots
Hide thumbs Also See for C Series:
Table of Contents

Advertisement

Installation: Joint #2 Reduction gear unit

NOTE
When tightening hexagon socket head cap bolts, refer to the 2.4 Tightening Hexagon Socket
Head Cap Bolts.
1. Unpack the new reduction gear unit package and check if it
contains the parts on the right.
Tooth grooves of the circular spline and the flexspline, and
the bearing of the wave generator are pre-greased.
Wipe grease if it is attached to the fitting parts.
■ Do not adjust the bolts securing the flexspline and the cross roller bearing. If the
bolts are adjusted, it requires centering of the parts by the reduction gear unit
manufacturer.
CAUTION
2. Set the O-rings to the grooves on both faces of the circular
spline.
Make sure to fit the rings completely.
3. Set the flexspline with the convex surface facing down.
After setting it, make sure to confirm that the surfaces of the
circular spline and flexspline are matched.
4. Match the screw holes on the cross roller bearing's inner ring
and the drilled holes on the circular spline.
C Series Maintenance Manual Rev.2
Concave surface
Convex surface
C4 Maintenance 6. Joint #2
Flexspline
+Cross roller bearing unit
O-ring
Circular spline
Wave generator
Concave surface
Convex surface
Groove
Groove
83

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4

Table of Contents