Joint #2 - Replacing The Timing Belt; Removal: Joint #2 Timing Belt; Installation: Joint #2 Timing Belt - Epson C Series Maintenance Manual

6-axis robots
Hide thumbs Also See for C Series:
Table of Contents

Advertisement

6.3 Joint #2 - Replacing the Timing Belt

Maintenance
Timing belt
Parts
Hexagonal wrench
(width across flats: 3 mm)
Cross-point screwdriver
Tools
Torque wrench
Cloth
Force gauge

Removal: Joint #2 Timing belt

1. Follow Removal steps (2) through (4) of C4 Maintenance: 6.1 Joint #2 – Replacing the Motor.
2. Remove the Arm #1 side cover.
For details, refer to C4 Maintenance: 3. Covers.
3. Loosen the Joint #2 motor unit set screw.
Hexagon socket head cap bolts: 3-M4×18
4. Remove the Joint #2 timing belt.
Remove the timing belt from the pulley 1 first.
Then, remove the timing belt from the pulley 2.
This procedure is common in C4-A601** and C4-A901**.

Installation: Joint #2 Timing belt

1. Place the Joint #2 timing belt to the pulley 1 and the pulley 2 of the Joint #2.
Place the timing belt to the pulley 2 first. Then, place the timing belt to the pulley 1.
2. Secure the Joint #2 motor unit.
For details, refer to C4 Maintenance: 6.1 Joint #2 – Replacing the Motor, Installation steps (6), (8), and (9).
C Series Maintenance Manual Rev.2
Name
Joint #2 of C4-A601**
Joint #2 of C4-A901**
(with a plain washer)
C4 Maintenance 6. Joint #2
Quantity
1
1520354
1
1593696
1
For M4 hexagon socket head cap bolt
1
For covers
1
1
For pressing arms
1
For belt tension
Note
87

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4

Table of Contents