General Maintenance; Maintenance Inspection; Schedule For Maintenance Inspection - Epson C Series Maintenance Manual

6-axis robots
Hide thumbs Also See for C Series:
Table of Contents

Advertisement

2. General Maintenance

This chapter describes maintenance inspection procedures.
inspection properly is essential to prevent trouble and ensure safety.
Be sure to perform the maintenance inspections in accordance with the schedule.

2.1 Maintenance Inspection

2.1.1 Schedule for Maintenance Inspection

Inspection points are divided into five stages: daily, monthly, quarterly, biannual, and annual.
The inspection points are added every stage.
If the Manipulator is operated for 250 hours or longer per month, the inspection points must
be added every 250 hours, 750 hours, 1500 hours, and 3000 hours operation.
1 month (250 h)
2 months (500 h)
3 months (750 h)
4 months (1000 h)
5 months (1250 h)
6 months (1500 h)
7 months (1750 h)
8 months (2000 h)
9 months (2250 h)
10 months (2500 h)
11 months (2750 h)
12 months (3000 h)
13 months (3250 h)
20000 h
h = hour
C Series Maintenance Manual Rev.2
Daily
Monthly
inspection
inspection
C4 Maintenance 2. General Maintenance
Inspection Point
Quarterly
Biannual
inspection
inspection
Performing maintenance
Annual
Overhaul
inspection
(replacement)
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4

Table of Contents