Epson C Series Maintenance Manual page 649

6-axis robots
Hide thumbs Also See for C Series:
Table of Contents

Advertisement

Installation: Control board 2
NOTE
When tightening hexagon socket head cap bolts, refer to the 2.4 Tightening Hexagon Socket
Head Cap Bolts.
1. Install the control board 2 to the plate.
Cross recessed head screws: 4-M3×8
Tightening torque: 0.45 ± 0.1 N·m
NOTE
Be careful of the assembly direction of the control board 2.
(See the photo.)
2. Install the plate with the control board 2 to the Arm #3.
Hexagon socket head cap bolts: 2-M4×10
Tightening torque: 4.0 ± 0.2 N·m
3. Connect the connector to the control board 2.
Connector: GS02
4. Install the Arm #3 cover.
For details, refer to C12 Maintenance: 3. Covers.
5. Turn ON the Controller power.
6. Check operation to see if the Manipulator's position and posture are out of position.
Move the Manipulator to two or three points (poses) of the registered points.
7. If the Manipulator is out of position, calibrate all the joints and axes.
For details, refer to C12 Maintenance: 16. Calibration.
C Series Maintenance Manual Rev.2
C12 Maintenance 12. Replacing the Control Board
629

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4

Table of Contents