Epson C Series Maintenance Manual page 88

6-axis robots
Hide thumbs Also See for C Series:
Table of Contents

Advertisement

C4 Maintenance 5. Joint #1
4. Install the flexspline to the shaft end face.
Insert the spacer between the screws and the part.
Hexagon socket head cap bolt: 6-M6×15
Tightening torque: 17.6 N·m (180 kgf·cm)
Install the flexspline to match the air
flex spline with these of the spacer.
5. Apply grease all over the tooth flank of the circular spline.
Grease: SK-1A
Grease amount: enough to fill the grooves
6. Install the circular spline.
Hexagon socket head cap bolt: 16-M4×20
Tightening torque: 4.9 N·m (50 kgf·cm)
7. Apply grease to the inside of the flexspline.
Grease: SK-1A
Grease volume: 40 g
68
escapement holes of the
Flexspline
Spacer
C Series Maintenance Manual Rev.2

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4

Table of Contents