Epson C Series Maintenance Manual page 572

6-axis robots
Hide thumbs Also See for C Series:
Table of Contents

Advertisement

C12 Maintenance 6. Joint #2
Installation: Joint #2 Reduction gear unit
When tightening hexagon socket head cap bolts, refer to the 2.4 Tightening Hexagon Socket
NOTE
Head Cap Bolts.
1.
Apply a thin coat of grease (SK-1A) to the O-ring.
Fit the O-ring to the groove on the Arm #2.
Do not allow the O-ring to come out of the groove.
If the O-ring is swollen, damaged, or deteriorated, replace it
with a new one.
2.
Install the reduction gear unit to the Arm #2.
Hexagon socket head cap bolts: 12-M6×45
Tightening torque: 18.0 ± 0.9 N·m
Installation face of the Arm #2 reduction gear unit has clearance holes.
Install the reduction gear unit to match the screws and the clearance holes.
3.
Grease the inner side of the flexspline.
Grease: SK-1A
Grease amount: 102g
4.
Insert the wave generator to the reduction gear unit and fix it.
552
C Series Maintenance Manual Rev.2

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4

Table of Contents