Fujitsu AIRSTAGE J-III L AJ 072LELAH Series Design & Technical Manual page 796

Hide thumbs Also See for AIRSTAGE J-III L AJ 072LELAH Series:
Table of Contents

Advertisement

z Group remote controller setting (Set I)
*1 : Set group remote controller address first, to conduct the initial setting of it.
*2 : The sum total of the Touch panel controller, Central remote controller, Network convertor for Group remote
controller and Network convertor for LONWORKS
*3 : Up to 64 Group remote controllers are able to connect with one VRF Network system.
z Dual remote control switch (Set J)
When 2 wired remote controllers are connected to the remote control group, turn the SW 2 of
DIP Switch 1 of Slave Remote Controller ON.
● Slave remote controller will not be valid for timer setting.
● Last command is priority.
[Master] [Slave]
SW2
OFF
ON
of DIP Switch 1
Remote controller unit PCB
Setting by SW 2 of DIP Switch 1
z Signal amplifier address (Set K)
Network
convertor for
00
Group remote
Group remote controller (Max. 4) *3
controller
(Max.16) *2
®
is a maximum of 16.
[Master]
SW2
OFF
of DIP Switch 1
When only 1 remote controller will connect,
this SW 2 of DIP Switch 1 must be set OFF.
Signal amplifier
- (07-15) -
01
02
03
1
2
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents