Fujitsu AIRSTAGE J-III L AJ 072LELAH Series Design & Technical Manual page 963

Hide thumbs Also See for AIRSTAGE J-III L AJ 072LELAH Series:
Table of Contents

Advertisement

z Installation abstract
Note
The belows are electricity meter connection methods which can be adapted by the System
Controller and TPC (Touch panel controller). However, the following mentioned setting
restrictions must be observed.
(1) Multiple VRF Networks can connect to 1 electricity meter. (with network crossover)
Note: UTY-ALGXZ1 (+UTY-PLGXE2) does not support multiple VRF Networks
VRF Network system 1
Whm
VRF Network system 2
VRF Network system 3
(2) With the electricity charge apportionment function, an electricity meter system cannot span
TPC.
Whm
Whm
Whm
Whm
Whm
Whm
Whm
TPC1 management range
TPC1
TPC2
TPC2 management range
TPC1 management range
TPC1
TPC2
TPC2 management range
- (07-182) -
Whm
VRF Network system 1
VRF Network system 2
Whm
VRF Network system 3
Whm
Create an electricity meter system within
the range of the units managed by each
TPC.
An electricity meter system spanning units
managed by TPC cannot be created.