Fujitsu AIRSTAGE J-III L AJ 072LELAH Series Design & Technical Manual page 988

Hide thumbs Also See for AIRSTAGE J-III L AJ 072LELAH Series:
Table of Contents

Advertisement

„ INPUT SIGNAL TYPE
The input signal type can be selected.
It is switched by Dip-Sw on the indoor unit PCB.
Dip-sw [Set 2-2]
OFF
u
ON
Note: input signal type of Ch3 (Forced thermostat off) is only "Edge".
„ CONTROL INPUT FUNCTION
z When function setting is "Operation/Stop" mode
●In the case of "Edge" input
Connector
Ch1 of
CNA01 or CNA02
Ch1 input of
On
CNA01 or
Off
CNA02
Operation
Indoor unit
Stop
Remote
Controller
●In the case of "Pulse" input
Connector
CNA01 or CNA02
Ch1 input
CNA01
or
CNA02
Ch2 input
Indoor unit
Remote
Controller
NOTE :
● The last command has priority.
● The indoor units within the same remote controller group operates in the same mode.
(u...Factory setting)
Input signal type
Edge
Pulse
Input signal
Command
OFF → ON
Operation
ON → OFF
Stop
Input signal
Ch1
OFF → ON
Ch2
OFF → ON
The width of pulse must be longer than 200msec.
On
Off
On
Off
Operation
Stop
- (08 - 12) -
Edge
Pulse
On
Command
Operation
Stop
On

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents