Installation - Fujitsu AIRSTAGE J-III L AJ 072LELAH Series Design & Technical Manual

Hide thumbs Also See for AIRSTAGE J-III L AJ 072LELAH Series:
Table of Contents

Advertisement

5-3. INSTALLATION

● Control box which is a part of RB units can be also changed the position depending on installation condition at
each side of RB units
● Please be sure to prepare Service access in control box side.
● Since the sound of refrigerant flow may be felt as an unusual sound, please do not install in the underpart of the
roof, such as a bedroom which sound worries.
„ MODELS : UTP-RX01AH, UTP-RX01BH, UTP-RX01CH
z Ceiling installation
500 or more
z Wall installation
E.g.: If installing a duct model vertically.
Service
space
Grille
20 or more
20 or more
500 or more
20 or more
Control box
Service access
300 or
more
Grille 20 or
more
- (10 - 34) -
Unit : mm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents