GE Vivid i n Service Manual page 470

Hide thumbs Also See for Vivid i n:
Table of Contents

Advertisement

GE H
EALTHCARE
D
FQ091013, R
IRECTION
2.) Under the Special Instructions area, activate the Loops checkbox
and select the required number of Loops from the combo box.
3.) Adjacent to On Fail, select either Stop or Continue, as required.
Stopping on failure enables you to review a failed test, the moment it fails. Alternatively, you may
prefer testing to continue on failure and later you may review the report.
4.) Trackball to the Start button and press Set.
The Full PC Doctor Test commences. While the test proceeds, the name of the test currently in
progress is displayed in the Execute field and the current Loop # and specific test are shown below.
The messages Init Done and Please Wait are displayed beside the progress bar in the Status area.
As the testing sequence progresses, the progress bar will advance to reflect the test progress.
Status indicators in the Data Flow map corresponding to the various system components will be
highlighted in the appropriate color to indicate the current test status, as follows:
5.) At any stage, trackball to the Pause button and press Set, if required.
6.) To resume testing (from the point where you paused), trackball to the Start button and press Set.
When the Full PC Doctor Test sequence is complete:
-
-
Note:
For the Full PC Doctor Test, many tests are performed in the test sequence; these are listed
in the Tests window as shown in
CPU Full Test) the corresponding report is listed in Reports on the right.
For details of each report, refer to the explanations provided in
7.) Use the scroll bars and/or arrows to scroll through the list of Test results and review the reports, as
required.
8) When done, trackball to the Exit button and press Set to close the View Report window.
7-118
1
EVISION
Green: All recommended tests for these components have been completed and no problems
were identified.
Red:
Problems were identified in these components during the performance of the test.
Yellow: The tests executed so far on these components have passed, but not all
recommended tests have been performed.
the Diagnostic Test window displays the Finished message
the View Test Log window opens automatically, listing all tests performed and showing details
of which tests and sub-tests passed or failed, as shown in the example in
Figure 7-83 View Test Log - Full PC Doctor Test
Section 7-6 - Performing Back End Diagnostics on the System
Figure
7-83. For each currently-selected test (for example,
V
V
N S
IVID I N AND
IVID Q
Figure
CPU Tests on page 7 -
M
ERVICE
ANUAL
7-81.
119:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vivid q nFl000110Fl000090Fq000001Vivid-iVivid-q

Table of Contents